Overhaul Of 6.9 Kv Vertical Motors

Removal of the motor from the pump (refer to fig. 1-6 and 1.7):

1.    Disconnect the following

a.    The power leads from the motor terminal in the main terminal box.
b.    All auxiliary leads.
c.    The water inlet and outlet piping from the bearing oil cooler.

2.    Drain the oil from the bearing oil reservoir.
        Drain the water from the oil cooler.

3.    Uncouple the motor from the pump.

4.    remove the bolts which secure the motor to the motor stand.


http://img101.herosh.com/2010/12/23/915970333.png 
FIG. 1-6



NAME OF PARTS
ITEM
NAME OF PARTS
ITEM
OIL WEIR
21.
RING NUT
  1.  
BEARING SEAL
22.
SPACER RING
  1.  
SHAFT
23.
THRUST RUNNER
  1.  
COOLING WATER INLET
24.
THRUST STOPPER (UP)
  1.  
COOLING WATER OUTLET
25.
GUIDE BEARING
  1.  
DETECTER GUIDE
26.
DASIL BOARD
  1.  
INSULATOR
27.
COOLING TUBE
  1.  


LIFTING DEVICE
  1.  


OIL FILLER (AIR BREATHER)
  1.  


OVERFLOW PLUG
  1.  


OIL LEVEL INDICTOR
  1.  


OIL POT
  1.  


THRUST BEARING
  1.  


SPACER
  1.  


OIL DRAINAGE
  1.  


OIL OUTLET PIPE
  1.  


BEARING GUIDE
  1.  


BEARING SUPPORT
  1.  


JACKING SCREW KEEPER
  1.  


JACKING SCREW
  1.  


http://img103.herosh.com/2010/12/23/409286237.png 

FIG. 1-7
Upper Bearing Dis assembly


(Refer to Fig. 1-8)
(1)     Remove the bearing seal.(Refer to Fig. 1-9)
(2)     Remove the oil weir.
(3)     Remove the lower guide bearing using by stud bolts and jack screw.
(4)     Remove the upper bearing seal.


http://img105.herosh.com/2010/12/23/651521248.png.
Fig. 1-8






http://img102.herosh.com/2010/12/23/198921271.png 

Fig. 1-9