Utilization factor The utilization factor represents a measure of the power utilization of power plants It is less than unity The utilization factor is defined as the ratio between the maximum dem…
Diversity factor The maximum demands of individual loads do not take place at the same moment The sum of individual peaks is not used as a measure of the maximumloaddemand The maximum installed po…
Demand factor The ratio between the real maximum load demand on the system and the connected load The demand factor varies from time to time and its value is always less than or equal unity The con…