System Constraints part 2System Constraints part 2

System Constraints part 1  Equality ConstraintsThe main equality constraints are the basic load flow equations that establish the flow  balance equations For example, the equality constrains accordin…

more information
09 Dec 2010

System ConstraintsSystem Constraints

The technical limitations that have not to be violated under  any condition The violation of these constraints affects the  power quality and the general operation of the power system and causes stab…

more information
09 Dec 2010

Economic load dispatchEconomic load dispatch

 The unit commitment study It optimally defines the required generators to meet the expected load and to provide a specified margin of operating reserve over a specified period of time  The economic…

more information
09 Dec 2010

Midal Cables LimitedMidal Cables Limited

•Midal Cables was established in 1977. It is presently one of the worlds largest producer of Aluminium & Aluminium Alloy Rod, Wires and Overhead Conductors with a rod capacity of 170,000 MT per annum.…

more information
09 Dec 2010

Satisfying Customers through the Supply Chain part 2Satisfying Customers through the Supply Chain part 2

 Satisfying Customers through the Supply Chain part 1 Satisfying Customers through the Supply Chain Security of supply in electricity depends on three parts of the electricity supply chain: - generati…

more information
09 Dec 2010

Satisfying Customers through the Supply ChainSatisfying Customers through the Supply Chain

Different Products have different shelf life Fast Food has a shelf-life of 3 hours  Dairy Products have a shelf-life of approx 4 to 7 days  A hotel room waits for you only 24 hours before you confirm …

more information
09 Dec 2010
 