If the constraints of upper or lower power limits are violated for any generator, the power is tied to the corresponding limit as a fixed value while the rest of the demand is distributed over the oth…
If the constraints of upper or lower power limits are violated for any generator, the power is tied to the corresponding limit as a fixed value while the rest of the demand is distributed over the oth…
MV switch disconnector Last June, I presented a paper at the CIRED conference with a title “Medium Voltage Disconnector s and Safety”… and a main message “MV disconnector s are not electrical safety d…
Every time I hear or read something about high voltage fuses, I’m convinced that15 years ago in the UK, we made the right choice by moving away from high voltage fuses to circuit-breakers. If we take…
According to the input-output curve of thermal power plant, the cost function is simplified in a quadrate form: C = α + β*P + γ*P2 This relation gives a good approximation to the actual variation of…
Economic Dispatch Problem part 1 The incremental heat rate “the heat rate” is the ratio of input fuel to the corresponding output power From the incremental heat rate curve, the incremental fuel ra…
Economic load dispatch concerns with the operating cost rather than the fixed cost Only fuel cost is considered in the study where all other costs that are depend on the generated power will be inclu…
Economic load dispatch concerns with the operating cost rather than the fixed cost Only fuel cost is considered in the study where all other costs that are depend on the generated power will be includ…